Investor zone

Building a
self-service car wash.

Plan your self-service car wash: from choosing the site and budget to selecting technology. TIXE will help organise the decisions ahead and prepare the project brief.

Car wash model showing bays and circulation on a site plan
From location to car wash layout

First step

What stage are you at?

Site and location

Is this a good location
for a car wash?

We will check the surrounding area, access, utilities and development potential.

01Customers and surroundings

Consider where customers may come from: residential areas, nearby businesses or daily routes. Compare the services, availability and operating approach of nearby car washes.

How to assess the local market
02Access, visibility and traffic

Check the approach from both directions. Assess visibility, turning opportunities and space for queues. High road traffic must be considered alongside how easy it actually is to enter the site.

03Utilities and ground conditions

Confirm the conditions for power and water supply, wastewater discharge and rainwater management. A lack of mains water, sewerage or gas does not necessarily rule out a project — alternatives require technical and regulatory assessment. Also check underground utilities and building lines.

04Development potential

Check the local spatial development plan with the municipality. If there is no plan, ask your designer whether a zoning decision is required. TIXE's investment department can help prepare technical data for further consultations.

Planning and access — more information
05Site width and layout

For an initial assessment of TIXE layouts, we use an indicative minimum of 18.5 m width for a drive-through car wash or 15.5 m for a non-drive-through car wash. These are design assumptions, not a universal statutory minimum. Development potential also depends on boundaries, utilities, building lines and circulation.

Budget and economics

What makes up
the cost of a car wash?

Four areas of project costsIllustrative chart with variable proportions: site and documentation, car wash and equipment, works and connections, marketing. Each project is priced individually.
  • Site and documentation
  • Car wash and equipment
  • Works and utility connections
  • Marketing

Every project has its own budget. The site, car wash size, equipment and scope of work affect the cost breakdown.

Site and documentation
Purchase or lease, design and regulatory preparation depending on the location.
Car wash and equipment
Number of bays, canopy style, technologies and additional equipment.
Works and utility connections
Ground conditions, access to utilities and the scope of on-site work.
Marketing
Site signage, opening promotion and reaching local customers.

Illustrative chart. Costs are determined individually.

Economic analysis

What affects a car wash's financial performance?

We will estimate investment costs, operating costs and revenue under several scenarios.

How can potential revenue be assessed?

Start with the number of washes and average transaction value, supported by a location analysis. Account for seasonality, competition and the time needed to attract customers. These assumptions should be tested under several scenarios.

Data for location analysis
What costs should be included after opening?

Water, electricity, heating, chemicals, payments, servicing and spare parts. Add fixed costs relevant to your project, including rent, insurance, accounting, taxes and financing. Revenue and the amount remaining after costs are different figures.

How to organise operating cost data
What should I prepare for a financing discussion?

A full cost estimate, spending schedule and information about your planned equity contribution. Combine the technology quotation with the costs of the site and construction work. Financing availability and terms are determined by the financing institution.

  • Own funds — staged payments according to the contract schedule.
  • Equipment leasing — scope, deposit and approval depend on the finance provider's assessment.
  • Investment loan — help preparing technology data, a cost estimate and a business plan.
  • Grants — checking current application rounds and the terms of a specific programme.
Discuss the scope of the cost estimate
Wash bays and vacuum cleaners separated by a wide access route
Bays, circulation and additional services in one layout.

From planning to opening

How is your car wash built?

Indicative stage durations. Dates and the sequence of work are confirmed in the project schedule.

2–3 monthsSite preparation
80–100 working daysCar wash production at the TIXE factory
2–6 working daysInstallation of the technical container and structure
01Discussion and assessment of assumptions

We discuss the location, project goal, scale and budget. We collect data and identify the information needed for further analysis.

What to prepare before your first meeting
02Concept and scope agreement

We combine the car wash layout with technology, canopy style and equipment. We clarify the scope of the quotation, design work and the investor's responsibilities.

How to combine technology and appearance
03Documentation and site preparation

The designer checks local conditions and documentation. Work includes levelling, utility connections, underground installations, heated flooring and circulation areas. Using a TIXE prefabricated slab can shorten some of the works; the scope is agreed in the design.

The role of the concept and designer
04Production and installation

Car wash production at our factory takes approximately 80–100 working days. Installation of the technical container and structure usually takes 2–6 working days. We agree the installation date once the site is confirmed ready.

Watch SIMPLE PREMIUM installation
05Commissioning and support

Once utilities are connected and operational, we configure the technology and prepare you to operate the site. Before opening, the relevant construction completion or occupancy approval procedure must be completed. We then support you with servicing, spare parts and chemical selection.

What you will find in the Partner zone
TIXE team installing the structure of a SIMPLE PREMIUM car wash
SIMPLE PREMIUM · installation stageView the project story

Free investment analysis

Discover the potential
of your location.

3 areas of analysis. Free of charge.Complete the form — we will help assess your project's potential.

01 Regional analysis
Surroundings, competition and customer potential.
02 Economic analysis
Investment costs, operating costs and revenue scenarios.
03 Site assessment
Bay layout, access, utilities and data for further consultations.

Request a free analysis.

Provide the location and your contact details. We will discuss the rest together.

Add site details or a question
Send analysis request

We will send your enquiry directly to the TIXE office.

TIXE Sp. z o.o. is the controller of the personal data provided. We will use it to handle your enquiry. Privacy policy.

Investor questions

What should you know
before deciding?

Is the car wash design included in the price?

After a car wash supply contract is signed, we prepare the design at no additional charge. In other cases, we charge a deposit which is settled when the contract is fulfilled.

The design must be adapted by a local designer. The scope of documentation, adaptation and approvals is agreed for each project.

Investment department · 696 911 553
Can I start without a site or a company?

Yes, the first discussion can be about an initial idea. A town or search area, intended scale and your questions are enough. This makes it easier to identify the data to collect before the next decisions.

Preparing for your first meeting
How large does the site need to be?

The area required depends on the number of bays, site shape, access and equipment. In addition to the structure, allow for queues, circulation, vacuum cleaners and equipment maintenance access. We check the specific layout on a map.

How much space a car wash needs
When can a reliable quotation be prepared?

Once we know the location and agree the car wash scope: bays, technology, canopy style and equipment. Site, construction and connection costs require information specific to the plot. The quotation should clearly identify items still awaiting pricing.

Economic analysis of the project
How long does the project take?

Preparatory site works take approximately 2–3 months, while installation of the technical container and structure takes 2–6 working days. The overall timeline also depends on documentation, approvals, production and utility availability. We agree the schedule after assessing the specific project.

See the project stages
Can I expand my car wash later?

Allow for expansion from the start: in the site, bay layout and technology. Rapid is a compact line for up to 3 bays. Express supports up to 6 bays per technical container and allows planning for further development. The final arrangement of technical containers, bays and additional systems is agreed in the design.

Compare Rapid and Express
What remains the investor's responsibility?

The division of work is set out in the agreed scope. It should identify who is responsible for the site, design, permits, works and connections, and who handles delivery, installation and commissioning. This list helps check that the cost estimate and schedule are complete.

Who is responsible for each stage of work
What should I consider when purchasing or leasing a site?

Link the contract terms to confirmation that the car wash project can proceed. For a lease, discuss its duration, the right to develop the site, how investment expenditure is settled and how the relationship ends. An appropriate term follows from the financial plan; have a lawyer review the draft agreement.

Checking the site before deciding
What formalities should be planned?

Checking spatial planning, preparing building permit documentation and obtaining required approvals. Water and wastewater management may require a water permit. Required notices must be filed before work starts; completion and occupancy procedures are determined for each site.

TIXE designers help with car wash data and documentation. Confirm procedures and deadlines with the lead designer and the relevant authorities.

Let's discuss the details

Prepare what
you already have.

Together we will identify the missing information and next steps.

  • The location or area where you are looking for a site.
  • A map, plot number and photos — if available.
  • Utility information and any documents you have.
  • An idea of the car wash scale, timeline and budget.
Full checklist for your first meeting

PRIVACY SETTINGS

Google map. Your choice.

You can find the directions map to the TIXE factory on the Contact page. You can use the entire website without enabling it.

Essential functions

Remembering selected settings. No analytics or advertising.

Always active
Show Google map

Only after you enable it will we connect to Google, which will receive connection data and may use cookies. Google policy ↗

You can change your choice in the footer at any time. Disabling the map stops it from loading, but does not delete data previously shared with Google.

TIXE privacy policy